PENA CONSTRUCTION IS A FAMILY OWNED BUSINESS SERVING CALIFORNIA

PROJECTS

Over the years we’ve been fortunate to complete various size projects for our clients. Samples of our projects are shown here, and below is a link to a gallery of our team at work. If you have any questions or would like more information on any of the projects you see here, please do not hesitate to contact us.

LT BURBANK | BURBANK, CA

Burbank Pena Construction

PROJECT SUMMARY: 

> Demolition of 10 acre former manufacturing facility.
> Removal of all concrete slabs and footings.
> 14,000 tons of concrete crushed on site for reuse. 
> Site soil remediation consisted of excavation and disposal of over 30,000 tons of contaminated soil.
> Over excavation of approximately 100,000 cubic yards for reuse.
> Provided 250,000 sqft of pad for forthcoming hotel, apartments and parking structure.

EASTON SPORTS FACILITY | VAN NUYS, CA

Easton Pena Demo

PROJECT SUMMARY:

> Demolition of former 115,000 sqft Easton facility multi-tenant commercial 3 story red brick and 2 story concrete wall structures. 
> Earthwork consisted of removal and recompaction of over excavation of 12,000 cubic yards.
> Provided 57,000 sqft of tilt up building pad along with 50,000 sqft of parking area.

BEST WESTERN INN | VALENCIA CA

Best Western Pena Demolition

PROJECT SUMMARY:

> Abatement consisted from removal of interior asbestos containing materials.
> Removal of 4,000 ft of underground Transite water lines. 
> Complete demolition of five 2-story concrete frame buildings that housed 250+ guest rooms.
> Removal of 130+ large Eucalyptus and Cedar Pine trees.

CONCORD SENIOR CENTER | PASADENA, CA

Pasadena Pena Construction

PROJECT SUMMARY:

> Removal of asbestos containing materials such acoustical ceilings and Transite panels.
> Demolition of 14-Story, 150+ unit Commercial building which included removal of walls, ceilings, etc.

FLOOR & DECOR | SAN GABRIEL, CA

Floor Decor Pena Construction

PROJECT SUMMARY:

> Interior demolition of 80,000 sqft commercial facility.
> Demolition of a 15,000 sqft concrete & metal frame mezzanine.
> Removal all ceilings, walls and flooring in order to return building back to structural state. 
> Earthwork consisted of grading for loading dock as well as resurfacing and paving of the site.

ALDI | THOUSAND OAKS, CA

Aldi Pena Demolition

PROJECT SUMMARY:

> Return 40,000 sqft building back to structural state.
> Demolition included removal of 12,000 sqft concrete and metal frame mezzanine.
> Removal of entire store front concrete walls required for building expansion with shoring.

VENICE RESIDENTS COLLECTION | LOS ANGELES, CA

Venice Pena Construction

Project Summary:

> Demolition of 2-story commercial concrete block building.
> Abatement of asbestos containing materials.
> Excavation and export of over 20,000 cubic yards of soil.
> Furnished 18,000 sqft subterranean parking structure pad.

WEHO | LOS ANGELES, CA

WEHO Pena Construction

Project Summary:

> Complete site clear and demolition of existing car wash facility.
> Abatement of asbestos containing materials. 
> Excavated and exported over 21,000 cubic yard.
> Provided 31,000 sqft of split level subterranean parking structure pad. 

For on-site photos of our projects, please go to our GALLERY.